Authority: IC 13-14-8-7; IC 13-15; IC 13-19-3
Affected: IC 13-18; IC 13-20; IC 36-9-30
Sec. 6. A permit application for a new MSWLF or a lateral expansion must be accompanied by an operational plan in the form of a narrative that describes the proposed MSWLF or lateral expansion. Each narrative must include information on the following:
- (1) Anticipated quantity, types, and sources of solid waste to be deposited.
- (2) Equipment to be used for placement and compaction of all solid waste, excavation of soil, movement of stockpiled soils, and application of cover soil.
- (3) Procedures to control fugitive dust in accordance with the applicable fugitive dust rules in 326 IAC 6-4.
- (4) Sanitary facilities.
- (5) A description of the access control to be used.
- (6) A description of the safety equipment to be used.
- (7) The distances from the site to the nearest dwelling, factory, and offices.
- (8) A description of the location, amount, and depth of excavation that will occur at the site.
- (9) A description of the supervision that will occur at the site.
- (10) A description of the base flood at the site and whether the site is in the floodway.
- (11) Proposed hours of operation.
- (12) The development and progression of the MSWLF or lateral expansion as illustrated in the plot plan required under section 2 of this rule.
- (13) The quantities of available and necessary cover soil. If cover material is to be obtained from a location other than the site of the proposed MSWLF or lateral expansion, the material's source, quantity, type, and characteristics must be identified.
- (14) Winter and inclement weather operating procedures, to include methods for obtaining and applying cover soil.
(15) A description of protective barriers, leachate, and methane control that includes the following:
- (A) Source and type of material utilized.
- (B) Method and specifications of construction.
- (C) Testing for construction quality control (CQC) and reviews for construction quality assurance (CQA) that will be made part of the reference information contained in the construction contract documents.
- (16) A description of the sign or signs proposed for the site, as required under 329 IAC 10-20-3.
- (17) Procedures for the disposal of bulky solid waste such as refrigerators, stoves, fence wire, and other similar items.
- (18) Procedures for controlling or handling windblown materials.
- (19) Procedures to be used to prevent and extinguish fires.
- (20) Details of salvage operations, if planned, indicating how the salvage operation will comply with 329 IAC 10-20-6.
- (21) Facilities for personnel and equipment.
- (22) Storage, treatment, and disposal methods for leachate.
- (23) Run-on and run-off control system as specified in 329 IAC 10-20-11.
- (24) Erosion and sedimentation control measures as specified in 329 IAC 10-20-12.
(Solid Waste Management Division; 329 IAC 10-15-6; filed Mar 14, 1996, 5:00 p.m.: 19 IR 1824; filed Mar 19, 1998, 11:07 a.m.: 21 IR 2766; filed Aug 2, 1999, 11:50 a.m.: 22 IR 3804; readopted filed Oct 16, 2024, 11:58 a.m.: 20241113-IR-329230812RFA)