Sec. 1. (a) A permit application for a new MSWLF or a lateral expansion must be accompanied by the following plans and documentation:
- (1) Plot plans as specified under section 2 of this rule.
- (2) Cross-sectional drawings and details as specified under section 3 of this rule.
- (3) A hydrogeologic site investigation report as specified under sections 4 and 5 of this rule.
- (4) An operational plan of the proposed MSWLF as specified under section 6 of this rule.
- (5) A CQA/CQC plan as specified under section 7 of this rule.
- (6) Calculations and analyses pertaining to MSWLF design as specified under section 8 of this rule.
- (7) An explosive gas management plan as specified under 329 IAC 10-20-17.
- (8) A closure plan as specified under 329 IAC 10-22-2.
- (9) A post-closure plan, as specified under 329 IAC 10-23-3.
- (10) A quality assurance project plan as specified under 329 IAC 10-21-2(b)(13).
- (11) A sampling and analysis plan as specified under 329 IAC 10-21-2.
- (12) A general description for developing the statistical evaluation plan that is required by 329 IAC 10-21-6(c). The description must include a time frame for submitting the statistical evaluation plan.
- (13) If applicable, a baled waste management plan as specified under section 9 of this rule.
- (14) A leak detection plan as specified under section 10 of this rule.
- (15) A leachate collection contingency plan as specified under section 11 of this rule.
- (16) A storm water pollution prevention plan as specified under section 12 of this rule.
- (17) Other plans as may be required by the commissioner based on particular site or facility conditions.
(b) Plans and documentation that accompany a permit application for a new MSWLF or a lateral expansion must be certified as follows:
- (1) The hydrogeologic site investigation report required in subsection (a)(3) must be certified by a licensed professional geologist or a qualified ground water scientist, either of whom shall have educational or professional experience in hydrogeology or ground water hydrology.
- (2) With the exception of the hydrogeologic site investigation report and the sampling and analysis plan, all plans and documentation required in subsection (a) must be certified by a registered professional engineer.
(c) A full set of plans and documentation required by this section must accompany each of the five (5) copies of the permit application required in 329 IAC 10-11-2.1(c).
(d) All plans and documentation must be properly titled.
(Solid Waste Management Division; 329 IAC 10-15-1; filed Mar 14, 1996, 5:00 p.m.: 19 IR 1817; filed Mar 19, 1998, 11:07 a.m.: 21 IR 2760; filed Aug 2, 1999, 11:50 a.m.: 22 IR 3797; filed Feb 9, 2004, 4:51 p.m.: 27 IR 1808, eff Apr 1, 2004; readopted filed Oct 16, 2024, 11:58 a.m.: 20241113-IR-329230812RFA)