Authority: IC 13-14-8; IC 13-18-12-4
Affected: IC 13-18-12
Sec. 5. (a) The use of a design or construction approach other than the requirements specified in this article or an innovative technology may be proposed to the department by the applicant in accordance with the following:
- (1) The proposal for the alternative design, construction, or innovative technology must be accompanied by documentation that ensures that the provisions of this article are met.
- (2) The proposal must comply with all applicable environmental rules and laws.
- (3) The proposal must be submitted with a septage management permit application.
(b) In making a determination on the alternative design, construction, or innovative technology, the commissioner shall consider the following criteria:
- (1) Design specifications that ensure adequate structural integrity.
- (2) Protective measures that reduce the potential for spills.
- (3) Operational practices that provide additional protection.
- (4) Threats of adverse impacts to water quality or other specified sensitive areas.
- (5) Other criteria related to protection of the environment or human health.
(c) The commissioner shall either:
- (1) approve the alternate design and construction, or innovative technology in the permit; or
- (2) send a letter to the applicant explaining the basis for the denial of the proposed alternate design, construction, or innovative technology.
(Water Pollution Control Division; 327 IAC 7.1-5.1-5; filed Mar 3, 2022, 10:40 a.m.: 20220330-IR- 327140029FRA; readopted filed Oct 18, 2024, 1:57 p.m.: 20241113-IR-327230810RFA)