Ind. Admin. Code tit. 326, r. 7-4-4
Authority: IC 13-14-8; IC 13-17-3
Affected: IC 13-17
Sec. 4. The following sources and facilities located in Wayne County shall comply with the sulfur dioxide emission limitations in pounds per million Btu, unless otherwise specified, and other requirements:
| Source | Facility Description | Emission Limitations | |
|---|---|---|---|
| (1) Belden Corp. | Boilers 3,4,5,6 (oil) (common stack) | 1.6 | |
| (2) Earlham College | Boilers 1 & 2 (oil/gas) (common stack) | 1.6 | |
| (3) Johns-Manville Co. | Boiler B-2 (oil/gas) | 1.6 | |
| Glass Furnaces SX-2,SX-3 (common stack) | 9 pounds per ton | ||
| (4) Joseph Hill (Plant A) | Boilers 1,2,4 (oil) (common stack) | 1.6 | |
| Boiler 3 (oil) | 1.6 | ||
| (5) Joseph Hill (Plant B) | Boilers 1,2,3 (oil/gas) (common stack) | 0.3 | |
| (6) Kemper | Boiler 1 (coal) | 2.3 | |
| Boiler 2 (wood/coal) | 2.1 | ||
| Boiler 3 (wood/sawdust) | 1.2 |
Kemper Boilers 1 and 2 also shall be limited to one and three-tenths (1.3) pounds per million Btu, and Boiler 3 also shall be limited to one and two-tenths (1.2) pounds per million Btu based on the annual average sulfur content of the fuel over any twelve (12) consecutive month period. (7) NATCO Boiler 1 (coal) 4.9
NATCO Boiler 1 also shall be limited to three and seven-tenths (3.7) pounds per million Btu based on the annual average sulfur content of the fuel over any twelve (12) consecutive month period. (8) Ralston Purina Co. Boilers 1 & 2 (oil/gas) common stack) 1.6 (9) Richmond Power and Light (RP&L) Boilers 1 and 2 (coal) (common stack) 6.0
RP&L shall construct a new good engineering practice stack with height of at least three hundred twenty-five (325) feet above grade by July 31, 1988. (10) Richmond State Hospital Boilers 1,2,3,4 (coal) (common stack) 6.0 (11) Sanyo E&E Boiler 1 (coal) 4.9 Boiler 2 (coal) 4.9
Sanyo E&E Boilers 1 and 2 also shall be limited to three and nine-tenths (3.9) pounds per million Btu based on the annual average sulfur content of the fuel over any twelve (12) consecutive month period.
| (12) Wallace Metals | Boiler 1 (oil/gas) | 1.6 |
(Air Pollution Control Division; 326 IAC 7-4-4; filed Aug 28, 1990, 4:50 p.m.: 14 IR 73; readopted filed Jan 10, 2001, 3:20 p.m.: 24 IR 1477; readopted filed Oct 18, 2024, 2:09 p.m.: 20241113-IR-326230809RFA)