Authority: IC 13-14-8; IC 13-17-3-4; IC 13-17-3-11
Affected: IC 13-15; IC 13-17
Sec. 3. The continuous compliance plan (CCP) shall include the following:
- (1) A list of the processes and facilities at the source.
- (2) A list of the particulate matter control equipment associated with the processes and facilities listed in section 1 of this rule.
- (3) The process operating parameters critical to continuous compliance with the applicable PM10 or TSP mass and opacity limits, including applicable specific requirements listed in section 5 of this rule.
- (4) The particulate matter control equipment operating parameters critical to continuous compliance with the applicable PM10 or TSP mass and opacity including applicable requirements listed in section 6 of this rule.
- (5) The specific monitoring, recording, and record keeping procedures for process and control equipment for each facility in the CCP specified in subdivisions (1) and (2).
- (6) The procedure used to assure that adequate exhaust ventilation is maintained through each duct at facilities where emissions are captured by a collection hood and transported to a control device.
(Air Pollution Control Division; 326 IAC 6.8-8-3; filed Aug 10, 2005, 1:00 p.m.: 28 IR 3534; readopted filed Oct 18, 2024, 2:09 p.m.: 20241113-IR-326230809RFA)