Sec. 21. (a) Mittal Steel-Indiana Harbor West Inc., in Lake County, source identification number 00318, shall meet the following emission limits:
| Emission Limits | ||
|---|---|---|
| Source | Units | lbs/hr |
| Stack serving number 3 blast furnace stoves | 0.027 lbs/MMBtu | 11.73 |
| Stack serving number 4 blast furnace stoves | 0.027 lbs/MMBtu | 12.93 |
| 3 stacks serving 84" hot strip mill slab reheat furnace numbers 1, 2, and 3 | 0.086 lbs/MMBtu | 36.56 |
| Utility boiler number 5 | 0.066 lbs/MMBtu | 25.69 |
| Utility boiler number 6 | 0.066 lbs/MMBtu | 25.69 |
| Utility boiler number 7 | 0.066 lbs/MMBtu | 25.69 |
| Utility boiler number 8 | 0.066 lbs/MMBtu | 61.59 |
| Basic oxygen furnace main stack | 0.018 gr/dscf | 69.40 |
| Reladling and desulfurization baghouse | 0.008 gr/dscf | 10.49 |
| Ladle metallurgical station baghouse | 0.004 gr/dscf | 3.630 |
| Sinter plant breaker discharge end | 0.02 gr/dscf TSP | 18.05 TSP |
| Sinter plant windbox stack 08 | 0.02 gr/dscf TSP | 49.70 TSP |
(b) The following opacity limits for Mittal Steel-Indiana Harbor West Inc., shall be complied with and shall take precedence over those in 326 IAC 5-1-2 with which they conflict:
| Source | Opacity |
|---|---|
| Basic oxygen furnace ladle metallurgical station baghouse | 5%, 3 minute average |
| Basic oxygen furnace main stack | 20%, 6 minute average |
| Basic oxygen furnace reladling and desulfurization baghouse | 5%, 3 minute average |
| Basic oxygen furnace shop roof monitor | 20%, 3 minute average |
(c) The installation and operation of opacity continuous emissions monitors shall be conducted according to procedures specified in 326 IAC 3. Before December 10, 1993, Mittal Steel-Indiana Harbor West Inc. basic oxygen furnace precipitator main stack shall have a continuous emission monitor for opacity installed and operating.
(d) The following combustion sources shall fire natural gas only:
(2) Number 3 sheet mill including:
(3) Number 2 Sheet Mill, No. 1 Galvanizing and Aluminizing Line, and No. 2 galvanize lines including:
(e) The following site-specific control requirements apply as follows:
(1) Basic oxygen furnace facility roof monitor. The twenty percent (20%), three (3) minute average opacity (20%) except for standard in this section shall be:
(2) Number 4 blast furnace. Compliance with the opacity limit shall be:
(Air Pollution Control Division; 326 IAC 6.8-2-21; filed Aug 10, 2005, 1:00 p.m.: 28 IR 3516; filed Jan 23, 2008, 1:44 p.m.: 20080220-IR-326040279FRA; readopted filed Oct 18, 2024, 2:09 p.m.: 20241113-IR-326230809RFA)