Ind. Admin. Code tit. 312, r. 29-33-12
Authority: IC 14-10-2-4; IC 14-37-3
Affected: IC 14-37
Sec. 12. (a) Within thirty (30) days of the conclusion of well plugging operations, all fluids and materials in the plugging pit shall be managed according to the requirements of this section and the pits backfilled and restored as specified in subsection (d).
(b) The plugging pit contents shall be removed to the maximum extent practical and, if not reused or recycled at another well location, the wastes shall be disposed of in one (1) or more of the following manners:
(c) Any synthetic liner used shall be removed to the fullest extent practicable and properly disposed of or recycled.
(d) The closed plugging pit shall be filled with native materials sufficient to ensure that the site is stable and will allow for settling with the final contour restored as close as possible to the original land contour.
(Natural Resources Commission; 312 IAC 29- 33-12; filed Dec 1, 2017, 10:35 a.m.: 20171227-IR-312160230FRA; readopted filed Jan 17, 2023, 1:53 p.m.: 20230215-IR- 312220328RFA)