Ind. Admin. Code tit. 312, r. 29-20-12
Authority: IC 14-10-2-4; IC 14-37-3
Affected: IC 14-37
Sec. 12. (a) During well drilling, completion, and workover operations, the owner or operator shall take precautions necessary to control the well at all times using methods, tests, and procedures as required under this section.
(b) The methods used shall be determined taking into consideration the maximum down hole pressures that may be encountered. All blowout prevention equipment shall be installed, operated, tested, and maintained in accordance with recommended practices for blowout prevention equipment systems.
(c) Well control measures include the use of one (1) or more of the following:
(d) Nothing in this section shall prohibit the drilling of wells on air or with cable tools without the use of water or other mud-laden fluids specified in subsection (c)(1) provided other measures are used as necessary to ensure proper well control.
(e) When well control equipment is used during drilling operations, the owner or operator shall equip the well with fittings necessary to circulate out formation gases or liquids. All equipment and fittings shall be rated with normal working pressure ratings that exceed the maximum anticipated surface pressure.
(f) The owner or operator shall perform the following tests and procedures and note in the driller's record, whenever blowout preventers are in use:
(g) At the conclusion of drilling and well completion operations, the owner or operator shall equip the well with well head assemblies to maintain surface control of the well. Each component of the well head shall have a pressure rating equal to or greater than the maximum anticipated pressure to which that particular component may be exposed during the course of logging, testing, servicing, or producing the well.
(Natural Resources Commission; 312 IAC 29-20-12; filed Dec 1, 2017, 10:35 a.m.: 20171227-IR- 312160230FRA; readopted filed Jan 17, 2023, 1:53 p.m.: 20230215-IR-312220328RFA)