Ind. Admin. Code tit. 312, r. 29-2-34
Authority: IC 14-10-2-4; IC 14-37-3
Affected: IC 14-37
Sec. 34. "Concrete production fluid storage structure" means a formed concrete impoundment, the base of which is at or below ground level, which is or has been used for the temporary storage of liquid oilfield waste or produced water prior to disposal.
(Natural Resources Commission; 312 IAC 29-2-34; filed Dec 1, 2017, 10:35 a.m.: 20171227-IR-312160230FRA; readopted filed Jan 17, 2023, 1:53 p.m.: 20230215-IR-312220328RFA)