Authority: IC 25-39-4-9
Affected: IC 25-39
Sec. 6. Within thirty (30) days after completion of a well, a water well driller must submit, on a departmental form or division-approved form, accurate records for each well drilled to include the following information:
- (1) The method of well construction.
(2) The proposed use of the well, for example:
- (A) residential;
- (B) industrial;
- (C) monitoring; or
- (D) dewatering.
(3) Pumping information, including each of the following:
- (A) The type of pump and the depth of the pump setting (if applicable).
- (B) Whether the well was bailer, air, or pump tested.
- (C) The test rate and length of time of test pumping.
- (4) Specifications for the well casing and the well screen.
- (5) The inside diameter of the well.
- (6) The total depth of the well.
- (7) The static water level in the well.
- (8) The name, address, and telephone number of the owner (and the builder, if different from the owner).
- (9) The name and address of the drilling company.
- (10) The name and license number of the equipment operator.
(11) The type and thickness of formations or materials encountered, including the following:
- (A) Color.
- (B) Hardness.
- (C) A geological description.
- (12) A statement of the accuracy of the information contained on the form that is signed by the water well driller or an authorized representative upon an affirmation or attestation.
- (13) The type, depth, and thickness of grouting materials and method of installation.
- (14) Specific roadway directions to the well, including a reference to the nearest major highway or street intersection.
(Natural Resources Commission; 312 IAC 13-2-6; filed Nov 22, 1999, 3:34 p.m.: 23 IR 766; readopted filed Aug 4, 2005, 6:00 p.m.: 28 IR 3661; readopted filed May 20, 2011, 3:28 p.m.: 20110615-IR-312110002RFA; filed Dec 20, 2011, 1:55 p.m.: 20120118-IR-312110332FRA; readopted filed Jul 19, 2017, 3:45 p.m.: 20170816-IR-312170132RFA; readopted filed May 17, 2023, 10:52 a.m.: 20230614-IR-312230069RFA)