Ind. Admin. Code tit. 170, r. 5-5-1.2
Authority: IC 8-1-26-26
Affected: IC 8-1-26-16; IC 8-1-26-18; IC 8-1-26-21
Sec. 1.2. An operator required to supply the location and description of the underground facilities under IC 8-1-26-18 shall, as part of the description, include the following:
(3) For pipeline facilities two (2) inches in diameter and larger, the:
(Indiana Utility Regulatory Commission; 170 IAC 5-5-1.2; filed Sep 20, 2023, 4:06 p.m.: 20231018-IR-170220359FRA, eff Jan 5, 2024)