The following costs may be paid from a grant made under this chapter:
- (1) Real property acquisition costs, including appraisal costs and negotiation costs.
- (2) Trail surfacing, resurfacing, rehabilitation, modernization, upgrading, and reconstruction, including pavement repairs and overlays and shoulder widening and stabilization.
- (3) Initial trail construction, including grading, drainage, paving, and erosion control.
- (4) Bridge and culvert repair, modernization, replacement, or initial construction.
- (5) Roadway intersection and interchange improvements, including warranted traffic signals that are an integral part of the project.
- (6) Construction or improvement of rest areas, information centers, waysides, permanent interpretive displays, lighting, and restrooms, including the costs of utility connections that are an integral part of the project.
- (7) Design engineering and construction inspection costs directly associated with the project.
- (8) Storm drainage and storm sewer costs to the extent needed for draining the trail.
- (9) Utility relocation costs necessary for trail construction or improvement if the utility is not located on a public road.
- (10) Trail signs, fencing, landscaping, parking areas, and walkways.
As added by P.L.40-1995, SEC.3.