(a) A department contract that specifies borrow or clearing and grubbing must require the contractor to conform to the department's manual of standard specifications and must include standards for the following:
- (1) Borrow pit back-slopes.
- (2) Control of drainage water.
- (3) Degree of restoration.
- (b) Restoration of borrow areas and disposal areas must meet or exceed the standards for seeding and sodding of roadside areas.
- (c) Final cleanup provisions of the contract apply to the removal and disposal of perishable materials and debris from the highway right-of-way to an off-road site.
As added by P.L.18-1990, SEC.218.