Ind. Code § 8-23-32-14
A worksite speed control system operator shall complete a daily log for the worksite speed control system that contains the following:
(4) A statement that:
(B) the device passed;
the tests of the worksite speed control system specified by the manufacturer before producing a photograph or recorded image.
As added by P.L.120-2023, SEC.2.