As used in this chapter, "cost" (as applied to a tollway or any part of a tollway) includes the following:
- (1) The cost of construction, including bridges over or under other public roads and railroads.
- (2) The cost of acquisition of all real property, rights-of-way, rights, easements, and interests acquired by the department for construction.
- (3) The cost of demolishing or removing any building or structure on acquired real property, including the cost of acquiring any real property to which buildings or structures may be moved.
- (4) The cost of diverting highways, interchanges of highways, and access roads to private property, including the cost of real property or easements.
- (5) The cost of all machinery and equipment.
- (6) The cost of traffic estimates and of engineering and legal expenses, plans, specifications, surveys, and estimates of costs and revenues.
- (7) Other expenses that are necessary or incidental to the construction, reconstruction, or conversion of the tollway and the placing of the tollway in operation.
- (8) Administrative expenses.
- (9) Any obligation or expense incurred by the department for surveys, borings, preparation of plans and specifications, and other engineering services in connection with the construction of a tollway under this chapter.
- (10) The repayment of a grant from a federal agency that the department itself is authorized to repay under section 19 of this chapter in connection with a tollway.
- (11) The cost of conversion of a state highway to a tollway under IC 8-23-7-22 .
As added by P.L.386-1987(ss), SEC.13. Amended by P.L.18-1990, SEC.135.