Ind. Code § 8-1-42-13
Except as otherwise allowed by IC 36-7-4-1109 , if a project owner installs a CSE system in a unit, all cables of up to thirty-four and one-half (34.5) kilovolts that are located between inverter locations and project substations shall be located and maintained underground, as feasible. Other solar infrastructure, such as module-to-module collection cables, transmission lines, substations, junction boxes, and other typical aboveground infrastructure may be located and maintained above ground. Buried cables shall be at a depth of at least thirty-six (36) inches below grade or, if necessitated by onsite conditions, at a greater depth. Cables and lines located outside of the CSE system project site may:
(34.5) kilovolts, be buried underground at:
(B) another depth, as necessitated by conditions;
as determined in consultation with the landowner.
As added by P.L.90-2022, SEC.2.