As used in this chapter, "qualified new rail infrastructure expenditures" means gross expenditures for new rail infrastructure, including:
- (1) construction of new track infrastructure such as industrial leads, switches, spurs, sidings, rail loading docks, and transloading structures, and engineering and site preparation involved with servicing new customer locations;
- (2) the expansion by a Class II or Class III railroad; or
- (3) construction of new track infrastructure involved with servicing new customer locations located in a qualified rural county.
As added by P.L.173-2025, SEC.2.