A proposal submitted in response to a request for proposals described in IC 5-30-6 must satisfy the following:
- (1) The qualitative proposal and the price proposal must be submitted simultaneously in separately sealed and identified packages. The price proposal must remain sealed until opened in public under section 5 of this chapter.
- (2) A proposal must identify each person with whom the offeror proposes to enter into subcontracts for primary design services and primary construction services, including any subcontractors, under the design-build contract. The public agency may determine requirements under this section.
(3) The price proposal must:
- (A) contain one (1) lump sum cost of all design, construction engineering, inspection, and construction costs of the proposed project; or
- (B) establish a maximum cost of the design-build contract that will not be exceeded if the proposal is accepted without change.
- (4) The qualitative proposal must include all the deliverables required for the qualitative proposal in the request for proposals.
As added by P.L.74-2005, SEC.1. Amended by P.L.166-2011, SEC.10.