The technical review committee shall rate the potential design-builders responding to the request for qualifications based on the rating system described under section 2(4) of this chapter. The rating system shall include consideration of any of the following:
- (1) The design-builder's experience.
- (2) The design-builder's financial and bonding capacity.
- (3) The design-builder's managerial resources and management plan.
- (4) The design-builder's safety record.
- (5) The design-builder's past performance and capacity to perform.
- (6) The design-builder's ability to complete the work in a timely and satisfactory manner.
- (7) Other selection criteria set forth or verified in the request for qualifications.
As added by P.L.74-2005, SEC.1.