Ind. Code § 36-9-27-62
(a) When the county surveyor has completed the maps, profiles, and plans required by section 61 of this chapter, the county surveyor shall meet with the board, and the board shall take the following actions:
(2) Determine the amount of damages sustained by all owners as a result of the proposed drain, and prepare a schedule of damages containing:
(C) an explanation of the injury upon which the determination was based.
The county surveyor shall add the damages to all lands as determined by the board to the estimated costs and expenses contained in the county surveyor's report, and the result constitutes the total estimated cost of the proposed drain.
(4) Set forth the amount of each owner's annual assessment based on the estimated periodic maintenance cost of the proposed drain. The percentage used in computing the annual assessment may, but need not, be the same for each tract of land as the percentage used in computing the general assessment.
The board may consider the factors listed in section 112 of this chapter in preparing the schedules.
(b) If land that was not included in the petition is determined to be benefited or damaged, the names of the owners and a description of the land shall be taken from the tax duplicates or record of transfers of the county.
[Pre-Local Government Recodification Citation: 19-4-2-11.]
As added by Acts 1981, P.L.309, SEC.101. Amended by P.L.127-2017, SEC.350.