Ind. Code § 36-9-27-50
When the county surveyor files a reconstruction report, the county surveyor shall consult with the board, and the board shall take the following actions:
(2) Determine the amount of damages sustained by any owner as a result of the reconstruction, and prepare a schedule of damages containing:
(C) an explanation of the injury upon which the determination was based.
The county surveyor shall add the damages to all lands as determined by the board to the estimated costs and expenses contained in the county surveyor's report, and the result constitutes the total estimated cost of the reconstruction.
(4) Set forth the amount of each owner's annual assessment based on the estimated periodic maintenance cost of the reconstruction. The percentage used in computing the annual assessment may, but need not be, the same for each tract of land as the percentage used in computing the general assessment.
The board may consider the factors listed in section 112 of this chapter in preparing the schedules.
[Pre-Local Government Recodification Citation: 19-4-3-2.]
As added by Acts 1981, P.L.309, SEC.101. Amended by P.L.127-2017, SEC.341.