The plan of operation must specify the following:
- (1) The method of assignment of closed block assets referred to in section 5 of this chapter that is being used.
- (2) The methods by which the designations of assets or portions of assets are changed during the course of closed block operations.
As added by P.L.94-1999, SEC.3.