In addition to the requirements under section 11 of this chapter, a storage structure that contains solid processed manure must be designed according to the following:
(1) The storage structure must:
- (A) be covered to prevent rainwater from contacting the processed manure; or
- (B) have storm water run-on and run-off controls.
- (2) The storage structure must not be constructed in sand or gravel soils, Unified Soil Classification of Pt, GW, GP, GM, GC, SW, SP, SM, as described in ASTM D2488-09a Standard Practice for Description and Identification of Soils (Visual-Manual Procedure), unless specially designed with a liner approved by the state chemist, in accordance with section 12 of this chapter.
- (3) Test holes for an earthen storage structure storing solid processed manure must be placed at a rate of two (2) holes for the first acre of storage and one (1) additional hole for each additional one-half (1/2) acre of storage.
As added by P.L.98-2026, SEC.51.