Ind. Code § 14-39-1-4.5
A carbon dioxide transmission pipeline company is not required to obtain a carbon dioxide transmission pipeline certificate of authority under section 4 of this chapter if either of the following applies:
(1) The carbon dioxide transmission pipeline to be constructed and operated:
(B) does not cross:
(2) The surface property above the storage facility crosses only one (1) or more of the following:
As added by P.L.25-2025, SEC.2. Amended by P.L.213-2025, SEC.133.