(a) For purposes of sections 7 and 8 of this chapter, a proposed revision of a permit is a minor field revision if the proposed change:
- (1) does not require technical review or design analysis; and
- (2) is capable of being evaluated in the field by the director's designated delegate for compliance with the requirements of section 7(d) of this chapter.
- (b) A minor field revision may be approved by a field inspector in an inspection report or on a form signed in the field.
(c) A minor field revision approved under this section:
- (1) must be properly documented and separately filed; and
(2) may include the following:
- (A) Soil stockpile location and configurations.
- (B) As-built pond certifications.
- (C) Minor transportation facilities changes.
(D) Any of the following for a pond:
- (i) Depth.
- (ii) Shape.
- (iii) Orientation.
- (E) An area for temporary drainage control or temporary water storage.
- (F) Equipment changes.
- (G) Explosive storage areas.
- (H) Minor mine management or support facility locations (except for the disposal or storage of refuse).
- (I) Adding United States Natural Resources Conservation Service conservation practices.
- (J) Methods of erosion protection on diversions.
- (K) Temporary cessation of mining.
- (L) Minor diversion location changes.
As added by P.L.75-1998, SEC.11.