(a) The following river basin commissions are established:
- (1) The Maumee River basin commission.
- (2) The St. Joseph River basin commission.
- (3) The Upper Wabash River basin commission.
- (b) After consulting with the surveyor of each county in a river basin, the director shall certify the boundaries of a commission established by subsection (a). However, a river basin commission established by subsection (a)(1), (a)(2), or (a)(3) is not required to recertify the commission's boundaries under this subsection.
As added by P.L.123-2026, SEC.38.