Ind. Code § 14-30-4-17

Rules

As added by P.L.35-2001, SEC.7.

The commission may adopt rules under IC 4-22-2 to require that increased water runoff resulting from new construction be impounded on the construction site.

As added by P.L.35-2001, SEC.7.

Log InSign Up