(a) A generator that ships solid waste to a waste-to-energy facility must, before the facility accepts the solid waste, notify the facility if the solid waste meets any of the following criteria:
(1) The solid waste contains:
(A) a volatile:
- (i) liquid; or
- (ii) solid;
- (B) a powder;
- (C) a flammable material;
- (D) an allergen; or
- (E) a sensitizer.
(2) The solid waste:
- (A) was segregated from other solid waste; or
- (B) received special preparation for shipment.
- (3) The solid waste is a bulk material.
- (4) The solid waste is a waste resulting directly from a manufacturing process.
- (b) The notification under subsection (a) is required before each shipment by a generator of solid waste in bulk quantities to a waste-to-energy facility.
As added by P.L.218-2001, SEC.8.