- (a) If any previously unmarked facility is exposed during excavation or demolition, emergency or nonemergency, the excavator responsible for the excavation or demolition operations shall immediately notify JULIE.
(b) At a minimum, the notice required under this Section shall provide:
- (1) a reference to the original excavation or demolition notice, if one exists;
- (2) the type of exposed facility, if known;
- (3) the name of the affected underground utility facility owner or operator, if known; and
- (4) the location of the exposed facility at the excavation or demolition site.
(Source: P.A. 103-614, eff. 1-1-25.)