- a) An EDC shall use Level 1 procedures to evaluate all interconnection requests to connect a DER facility when:
1) The applicant has filed a Level 1 application; and
- 2) The DER facility has an export capacity of 25 kW or less and a nameplate capacity of 50 kW or less. If the DER facility's export capacity is not limited, the nameplate capacity cannot exceed 25 kW; and
- 3) The DER facility is inverter-based; and
- 4) The customer interconnection equipment proposed for the DER facility is lab-certified.
- b) An EDC shall use Level 2 procedures for evaluating interconnection requests when:
1) The applicant has filed a Level 2 application;
2) For certified inverter-based systems, the permissible nameplate capacity is limited according to the voltage of the line at the proposed point of interconnection as follows:
| Line Voltage | Level 2 Eligibility |
| < 5 kV | ≤ 500 kW |
| ≥ 5 kV and < 15 kV | ≤ 3 MW |
| ≥ 15 kV and < 30 kV | ≤ 4 MW |
| ≥ 30 kV and ≤ 69 kV | ≤ 5 MW |
- 3) All DER facilities connecting to lines greater than 69 kV are ineligible for Level 2 review regardless of size. All synchronous and induction machines must have a nameplate capacity no larger than 2 MW to be eligible;
- 4) The interconnection equipment proposed for the DER facility is lab-certified; and
- 5) The proposed interconnection is to a radial distribution circuit or a spot network limited to serving one customer.
c) An EDC shall use Level 3 review procedures for evaluating interconnection requests to area networks and radial distribution circuits where power will not be exported based on the following criteria.
- 1) For interconnection requests to the load side of an area network, the following criteria shall be satisfied to qualify for a Level 3 expedited review:
A) The applicant has filed a Level 3 application; and
- B) The nameplate capacity of the DER facility is less than or equal to 50 kW; and
- C) The proposed DER facility uses a lab-certified inverter-based equipment package; and
- D) The DER facility uses acceptable means for non-export controls as set forth in Section 466.75; and
- E) The aggregate of all generation on the area network does not exceed the lower of 5% of an area network's maximum load or 50 kVA.
- 2) For interconnection requests to a radial distribution circuit, the following criteria shall be satisfied to qualify for a Level 3 expedited review:
A) The applicant has filed a Level 3 application; and
- B) The aggregate export capacity of all the generators on the circuit, including the proposed DER facility, is 10 MVA or less; and
- C) The DER facility will use acceptable means for controlling export as set forth in Section 466.75; and
- D) The DER facility is not served by a shared transformer.
d) An EDC shall use the Level 4 study review procedures for evaluating interconnection requests when:
- 1) The interconnection request does not qualify for Level 1, 2, or 3 expedited review;
- 2) The interconnection request failed one or more screens of a Level 1, 2, or 3 expedited review, or a Level 2 supplemental review; or
- 3) The applicant has filed a Level 4 application.
An EDC shall determine whether an interconnection request should be processed under the Level 1, 2, 3 or 4 procedures by using the following screens:
(Source: Amended at 46 Ill. Reg. 9666, effective May 26, 2022)