Ill. Admin. Code tit. 62, § 245.1000
c) Special Plugging Requirement
If the permittee stimulates the geologic formation in accordance with the permit using a high volume horizontal hydraulic fracturing process, then once commercial production ceases from the well and it is time to plug the well, in addition to all the other requirements, the permittee shall initiate the plugging process using a circulation method starting at the top of the geologic formation stimulated installing a cement plug at least 100 feet above the top of the geologic formation.