Ill. Admin. Code tit. 35, § 226.160
b) An owner or operator of a lead emission unit subject to the total enclosure requirement of Section 226.155 must measure the facial velocity of air flowing through all natural draft openings using the following equation while any lead emission unit applicable to the operation listed in Section 226.155(a) is operating. Values for Qo and QI must be obtained by means of testing pursuant to subsection (b)(1) or monitoring pursuant to subsection (b)(2):

Where:
| Q0 | = | the sum of volumetric flow from all gas streams exiting the total enclosure through the control device. |
| QI | = | the sum of the volumetric flow from all gas streams into the total enclosure through a forced makeup air duct; zero if there is no forced makeup air into the total enclosure. |
| An | = | total area of all natural draft openings in the total enclosure. |
2) An owner or operator of a lead emission unit subject to the total enclosure requirement of Section 226.155 must install, maintain, and operate a flow monitor at the outlet of each control device required by Section 226.140 to measure the volumetric flow from all gas streams exiting the total enclosure through the control device (or the final control device emitting to the atmosphere if the source has more than one control device in series). This volumetric flow data must be monitored and automatically recorded every minute.
c) As an alternative to compliance with the requirements of subsection (b), an owner or operator of a lead emission unit subject to the total enclosure requirement of Section 226.155 must install, operate, and maintain instrumentation to monitor the pressure differential between the interior and exterior of the enclosure, measured in inches of water, to demonstrate compliance with the differential pressure requirements in Section 226.155(c). This instrumentation must be located and designed to operate in accordance with all of the requirements of subsections (c)(1) through (6):
B) The windward wall.
d) An owner or operator of a lead emission unit subject to the total enclosure requirement of Section 226.155 must develop and maintain a Continuous Parametric Monitoring Plan containing the information required in subsection (d)(1), (2), or (3). The CPMP must be submitted for review and approval to the Section Manager by the compliance date specified in Section 226.130 and within 30 days after any changes are made to the plan. The CPMP must be amended by the owner or operator of a lead emission unit subject to this Part as necessary to ensure that it is kept current. The owner or operator of a lead emission unit subject to this Part must conduct monitoring in accordance with the CPMP at all times.
1) If electing to comply with the facial velocity requirement in Section 226.155(c) using the total enclosure measurement method in subsection (b)(1), the CPMP must contain the information required by subsections (d)(1)(A) through (D).
2) If electing to comply with the facial velocity requirement in Section 226.155(c) using the total enclosure monitoring method in subsection (b)(2), the CPMP must contain the information required by subsections (d)(2)(A) through (C).
3) If electing to comply with the average differential pressure requirement in Section 226.155(c) using the total enclosure measurement method in subsection (c), the CPMP must contain the information required by subsections (d)(3)(A) through (C).