Ill. Admin. Code tit. 35, § 220.240
a) The methods specified in subsections (a)(1) through (a)(6) of this Section shall be used to determine whether the gas collection system is in compliance with Section 220.220 of this Subpart.
1) To calculate the maximum expected gas generation flow rate from the MSW landfill, one of the following equations shall be used. The k and Lo kinetic factors shall be those published in the Compilation of Air Pollutant Emission Factors (AP-42) incorporated by reference in Section 220.130 of this Part, or other site-specific emission factors approved by the Agency. If k has been determined as specified in Section 220.260(a)(4) of this Subpart, the value of k determined from the test shall be used. A value of no more than 15 years shall be used for the intended use period of the gas mover equipment, the variable t. The active life of the landfill is the age of the landfill plus the estimated number of years until closure.
A) For sites with unknown year-to-year solid waste acceptance rate:
| Qm | = | 2LoR(e-kc-e-kt) |
where:
| Qm | = | maximum expected gas generation flow rate, m3/yr |
| Lo | = | methane generation potential, m3 per Mg solid waste |
| R | = | average annual acceptance rate, Mg/yr |
| k | = | methane generation rate constant, yr-1 |
| t | = | age in years of the landfill at equipment installation plus time the owner or operator intends to use the gas mover equipment or active life of the landfill, whichever is less. If the equipment is installed after closure, t in years is the age of the landfill at installation. |
| c | = | time since closure, years (for an active landfill c = 0 and e-kc = 1) |
B) For sites with known year-to-year solid waste acceptance rates:
| Qm | = | n | 2kLoMi( ) |
| Σ | |||
| i=1 |
where:
| Qm | = | maximum expected gas generation flow rate, m3/yr |
| k | = | methane generation rate constant, yr-1 |
| Lo | = | methane generation potential, m3 per Mg solid waste |
| Mi | = | mass of solid waste in the ith section, Mg |
| ti | = | age of the ith section, yr |
b) To comply with the operational standards in Section 220.250(a) of this Subpart, each owner or operator of a controlled landfill shall install each well or design component as specified in a construction permit issued by the Agency. Each well shall be installed no later than 60 days after the date on which the initial solid waste has been in place for a period of:
c) The following procedures shall be used for compliance with the surface methane operational standard as provided in Section 220.250(d) of this Subpart.
4) Any reading of 500 ppm or more above background at any location shall be recorded as a monitored exceedence and the actions specified in subsections (c)(4)(A) through (c)(4)(E) of this Section shall be taken. As long as the actions specified below are taken, the exceedence is not a violation of the operational requirements of Section 220.250(d) of this Subpart.
d) The following instrumentation specifications and procedures for surface emission monitoring devices apply to the monitoring required by subsection (c) of this Section: