Ill. Admin. Code tit. 35, § 817.411
a) Purpose. The operator shall conduct a hydrogeologic investigation to develop hydrogeologic information for the following uses:
b) General requirements:
c) Minimum requirements for a Phase I investigation:
1) The operator shall conduct a Phase I investigation to develop the following information:
2) Specific requirements:
d) Minimum requirements for a Phase II hydrogeologic investigation (Phase II investigation):
1) Information to be developed. Using the information developed in the Phase I survey, a Phase II investigation shall be conducted to collect the site-specific information listed below as needed to augment data collected during the Phase I investigation and to prepare for the Phase III investigation:
2) Specific requirements:
e) Minimum standards for a Phase III investigation:
1) Using the information developed during the Phase I and Phase II investigations, the operator shall conduct a Phase III investigation. This investigation shall be conducted to collect or augment the site-specific information needed to carry out the following: