Ill. Admin. Code tit. 35, § 812.110
Surface Water Control
AUTHORITY: Implementing Sections 7.2, 21, 21.1, 22, 22.17, and 22.40, and authorized by Section 27 of the Environmental Protection Act [415 ILCS 5/7.2, 21, 21.1, 22, 22.17, 22.40, and 27].POLLUTION CONTROL BOARD
- a) A copy of the approved National Pollutant Discharge Elimination System (NPDES) permit issued pursuant to 35 Ill. Adm. Code 309 or, if a permit is pending, a copy of the NPDES permit application to discharge runoff from all disturbed areas on the facility;
- b) A map showing the location of all structures affected by the surface water runoff from disturbed areas on the facility;
- c) Detailed designs of all structures to be constructed during development of the facility and during the first five year operating period; and
- d) Estimated construction dates of all structures to be constructed beyond the first five year operating period.
The permit application shall contain a plan for controlling surface water which demonstrates compliance with 35 Ill. Adm. Code 811.103, and which shall include at least the following: