Ill. Admin. Code tit. 35, § 812.107
Site Plan Map
AUTHORITY: Implementing Sections 7.2, 21, 21.1, 22, 22.17, and 22.40, and authorized by Section 27 of the Environmental Protection Act [415 ILCS 5/7.2, 21, 21.1, 22, 22.17, 22.40, and 27].POLLUTION CONTROL BOARD
- a) The entire permit area;
- b) The boundaries, both above and below ground level, of the facility and all units included in the facility;
- c) Location of borrow areas;
- d) Boundaries of all areas to be disturbed;
- e) The proposed phasing of the facility, including a delineation of the approximate area to be disturbed each year and areas expected to be closed each year in compliance with 35 Ill. Adm. Code 811.107(a);
- f) All roads in and around the facility;
- g) Devices for controlling access to the facility;
- h) Devices for controlling litter;
- i) Fire protection facilities; and
- j) Utilities.
The application shall contain maps, including cross sectional maps of the site boundaries, showing the location of the facility on a scale no smaller than one inch equals 200 feet containing a two-foot contour interval. The following information shall be shown: