- a) An operator of a waste management site shall have prepared a written closure plan which shall be a condition of the site permit.
- b) The operator of an indefinite storage unit shall have prepared a written contingent closure plan which shall be a condition of the site permit. The contingent closure plan shall be the same as a closure plan, except as otherwise specifically provided.
c) The closure plan shall include as a minimum:
- 1) Steps necessary for the premature final closure of the site at the time during its intended operating life when the cost of closure will be the greatest;
- 2) Steps necessary for the final closure of the site at the end of its intended operating life;
- 3) Steps necessary to prevent damage to the environment during temporary suspension of waste acceptance if the operator wants a permit which would allow temporary suspension of waste acceptance at the site without initiating final closure;
- 4) A description of the steps necessary to decontaminate equipment during closure;
- 5) An estimate of the year in which the cost of premature closure will be the greatest;
- 6) An estimate of the expected year of closure;
7) Schedules for the premature and final closure which shall include at a minimum:
- A) Total time required to close the site; and
- B) Time required for closure activities which will allow tracking of the progress of closure; and
- 8) A description of methods for compliance with all closure requirements of this Part.
- d) The closure plan shall be included in the permit application pursuant to Section 807.205.
- e) Until closure has been completed, the operator shall maintain a copy of the closure plan at the site or at a definite location, specified in the permit, so as to be available during inspection of the site.
(Source: Amended at 9 Ill. Reg. 18942, effective November 25, 1985)