Ill. Admin. Code tit. 35, § 704.212
b) The owner or operator must adjust the cost estimate for inflation within 30 days after each anniversary of the date on which the first cost estimate was prepared. The adjustment must be made as specified in subsections (b)(1) and (b)(2), using an inflation factor derived from the annual update to "Oil and Gas Lease Equipment and Operating Costs 1987 to [Date]" published by the U.S. Department of Treasury. The inflation factor is the result of dividing the latest published annual Index by the Index for the previous years.
2) Subsequent adjustments are made by multiplying the latest adjusted cost estimate by the latest inflation factor.
BOARD NOTE: Corresponding 40 CFR 144.62(b) cites "Oil and Gas Field Equipment Cost Index" without attribution of its source. The Board has located a publication entitled "Oil and Gas Lease Equipment and Operating Costs 1987 to [Date]". It is assembled by the U.S. Department of Energy, Energy Information Administration. It is available only on the Internet at www.eia.doe.gov. The Board replaced the federally cited reference with this document. The full link for the document (in March 2006) is as follows: http://www.eia.doe.gov/pub/oil_gas
/natural_gas/data_publications/cost_indices_equipment_production/current
/coststudy.html.
d) The owner or operator must keep the following at the facility during the operating life of the facility: the latest cost estimate prepared in accordance with subsections (a) and (c) and, when this estimate has been adjusted in accordance with subsection (b), the latest adjusted cost estimate.
BOARD NOTE: Derived from 40 CFR 144.62 (2017).
(Source: Amended at 42 Ill. Reg. 21095, effective November 19, 2018)