Ill. Admin. Code tit. 35, § 703.301
a) Definition of a RAP.
4) A RAP may be either of the following:
6) If an owner or operator receives a RAP at a facility operating under interim status, the RAP does not terminate the facility's interim status.
BOARD NOTE: Subsection (a) is derived from 40 CFR 270.80 (2002).
b) When an owner or operator needs a RAP.
1) Whenever an owner or operator treats, stores, or disposes of hazardous remediation wastes in a manner that requires a RCRA permit under Section 703.121, an owner or operator must obtain either of the following:
3) An owner or operator may obtain a RAP for managing hazardous remediation waste at an already permitted RCRA facility. An owner or operator must have the RAP approved as a modification to the owner's or operator's existing permit according to the requirements of Sections 703.270 through 703.273 or Sections 703.280 through 703.283 instead of the requirements in this Subpart H. However, when an owner or operator submits an application for such a modification, the information requirements in Sections 703.281(a)(1), 703.282(a)(4), and 703.283(a)(4) do not apply. Instead, an owner or operator must submit the information required under Section 703.302(d). When the owner’s or operator’s RCRA permit is modified, the RAP becomes part of the RCRA permit. Therefore, when the owner's or operator's RCRA permit (including the RAP portion) is modified or reissued, or terminated, or when it expires, the permit will be modified, according to the applicable requirements in Sections 703.270 through 703.273 or 703.280 through 703.283, it will be revoked and reissued, according to the applicable requirements in 35 Ill. Adm. Code 702.186 and Sections 703.270 through 703.273, or it will be terminated, according to the applicable requirements in 35 Ill. Adm. Code 702.186, or the permit will expire, according to the applicable requirements in 35 Ill. Adm. Code 702.125 and 702.161.
BOARD NOTE: Subsection (b) is derived from 40 CFR 270.85 (2002).
c) The provisions of 35 Ill. Adm. Code 702.181 apply to RAPs.
BOARD NOTE: Subsection (c) is derived from 40 CFR 270.90 (2002). The corresponding federal provision includes an explanation that 40 CFR 270.4 provides that compliance with a permit constitutes compliance with RCRA. This is contrary to Illinois law, under which compliance with a permit does not constitute an absolute defense to a charge of violation of a substantive standard other than a failure to operate in accordance with the terms of a permit. See 35 Ill. Adm. Code 702.181(a) and accompanying Board Note.
(Source: Amended at 31 Ill. Reg. 487, effective December 20, 2006)