Ill. Admin. Code tit. 35, § 604.250
a) Sand or Gravel Wells
b) Gravel Pack Material
1) Gravel pack materials must:
A) be sized based on sieve analysis of the formation; and
2) Gravel Pack
A) Gravel pack must be placed in one continuous operation.
c) Radial Water Collector
3) Caisson Construction
d) Fractured or Highly Permeable Bedrock Aquifer Wells