Ill. Admin. Code tit. 35, § 372.240
a) General
The size of the application area shall be based on the limiting characteristic of the treated wastewater and the site. Balances shall be calculated and submitted for water, nitrogen, phosphorus, and 5 Day Biochemical Oxygen Demand (BOD5). Loading rates must be established for each parameter. The critical loading rate will determine the application area required.
b) Water Balance
c) Nitrogen Balance