- a) After closure, and until completion of the post-closure report, the owner or operator of Ash Pond D must conduct inspections of the cover system at the same time and frequency as the groundwater monitoring sampling schedule set forth in Section 840.114 of this Subpart.
- b) The owner or operator of Ash Pond D must fill all rills, gullies, and crevices six inches or deeper. Areas identified as particularly susceptible to erosion must be recontoured.
- c) The owner or operator of Ash Pond D must repair all eroded and scoured drainage channels and replace lining material, if necessary.
- d) The owner or operator of Ash Pond D must fill and recontour all holes and depressions created by settling so as to prevent standing water.
- e) The owner or operator of Ash Pond D must revegetate all areas in excess of 100 square feet, cumulative, with failed or eroded vegetation.
- f) The owner or operator of Ash Pond D must repair all tears, rips, punctures, and other damage to the geosynthetic membrane.
- g) The owner or operator must prevent the growth of woody species on the protective cover.
The owner or operator of Ash Pond D must maintain the surface of the cover system beginning immediately after construction until approval of the post-closure report by the Agency.