(1) Compliance schedule. The director may establish a compliance schedule for facilities as part of the permit conditions including:
- (a) Specific steps or actions to be taken by the permittee to achieve compliance with applicable requirements or permit conditions; and
- (b) Dates by which those steps or actions are to be taken.
(2) Monitoring requirements. Any facility may be subject to monitoring requirements including, but not limited to, the following:
- (a) The type, installation, use and maintenance of monitoring equipment;
- (b) Monitoring or sampling methodology, frequency and locations;
- (c) Monitored substances or parameters;
- (d) Testing and analytical procedures; and
- (e) Reporting requirements including both frequency and form.
[25-4009, added 2011, ch. 227, sec. 1, p. 618.]