Iowa Admin. Code r. 721-45.5
Posting of preliminary notice; renewal of notice; inactive notice
Effective Oct 22, 2025Published Sep 17, 2025[ARC 0464C, IAB 11/28/12, effective 1/2/13; ARC 7059C, IAB 8/23/23, effective 9/27/23; ARC 9564C, IAB 9/17/25, effective 10/22/25]Secretary of State
721—45.5(572) Posting of preliminary notice; renewal of notice; inactive notice.
45.5(1) Posting by subcontractor.
- a. A subcontractor for residential construction who has provided or will provide labor or furnish material for residential construction shall post a preliminary notice to the MNLR, or the subcontractor is not entitled to a lien or remedies provided in Iowa Code chapter 572.
- b. Prior to the posting of a preliminary notice, a notice of commencement of work must be posted on the MNLR. If the general contractor or owner-builder has not posted a notice of commencement of work on the MNLR within ten days of commencement of work on the property, then the subcontractor may post a notice of commencement of work on the MNLR prior to posting the preliminary notice. In order to post a notice of commencement of work on the MNLR, the subcontractor must comply with subrule 45.4(2).
45.5(2) Contents of preliminary notice. The information provided by the subcontractor shall, at a minimum, include:
- a. The name of the owner.
- b. The MNLR number.
- c. The name, address, and telephone number of the subcontractor furnishing the labor, service, equipment, or material.
- d. The name and address of the person who contracted with the claimant for the furnishing of the labor, service, equipment, or material.
- e. The name of the general contractor or owner-builder under which the claimant is performing or will perform the work.
- f. The address of the property or a description of the location of the property if the property cannot be reasonably identified by an address.
- g. The legal description of the property.
- h. The date the material or materials were first furnished or the labor was first performed.
- i. The tax parcel identification number.
- j. The county or counties in which the building, land, or improvement to be charged with the lien is situated.
- k. The email address of the subcontractor or the email address of another individual or entity designated to receive electronic correspondence on behalf of the subcontractor.
- 45.5(3) Preliminary notice owner notice. At the time that a preliminary notice is posted on the MNLR, the administrator shall mail a written owner notice, as provided in paragraphs 45.4(3)“a” and 45.4(3)“b,” to the owner’s address. An owner-builder shall not receive an owner notice.
- 45.5(4) Proof of service of owner notice. The administrator shall post a proof of service on the MNLR. The subcontractor may obtain a copy by downloading the proof of service from the record of postings by MNLR number.
- 45.5(5) Renewal of preliminary notice. A preliminary notice may be renewed on the MNLR within 60 days prior to being declared inactive.
- 45.5(6) Preliminary notice declared inactive. A preliminary notice that remains posted on the MNLR two years after the date of posting shall be declared inactive by the administrator, unless renewed.
- 45.5(7) Removal of inactive notice. A preliminary notice shall be removed from the MNLR one year after being declared inactive.
[ARC 0464C, IAB 11/28/12, effective 1/2/13; ARC 7059C, IAB 8/23/23, effective 9/27/23; ARC 9564C, IAB 9/17/25, effective 10/22/25]