D.C. Mun. Regs. tit. 11-K, § 1310
1310.1 The provisions of this section apply to properties within the NYE zone.
1310.2 With respect to those properties described in Subtitle K § 1310.1, all proposed uses, buildings, and structures, any proposed exterior renovation to any existing buildings or structures that would result in an alteration of the exterior design, and the waterfront park and any structures on or over the water shall be subject to review and approval by the Zoning Commission in accordance with Subtitle Z § 301 and the following provisions.
1310.3 In addition to proving that the proposed use, building, structure, waterfront park, or structures on or over the water meets the standards set forth in Subtitle X § 604 and the relevant provisions of this chapter, an applicant requesting approval under this section shall prove that the proposed building or structure, including the siting, architectural design, site plan, landscaping, sidewalk treatment, and operation, will:
landscaping, and the provision of active ground level uses; and
(h) The application shall include a view analysis that assesses openness of views and vistas, including views along and toward the waterfront and a minimum of two site sections through the building, including a minimum of one section extending from the north property line through the building to the waterfront.
1310.4 Each application for design review under this section will be referred to the Office of Planning, DC State Historic Preservation Office, Department of Transportation, Department of Energy and Environment, and other District agencies deemed appropriate for review and comment.
1310.5 The Zoning Commission may hear and decide any additional requests for special exception or variance relief needed for the subject property. Such requests shall be advertised, heard, and decided together with the application for Zoning Commission review and approval.
1310.6 At the time of filing an application with the Zoning Commission, the applicant shall pay the filing fee specified in Subtitle Z, plus such fees as apply to any additional zoning relief requested.
SOURCE: Final Rulemaking published at 72 DCR 006195 (May 23, 2025).