D.C. Code § 34-2401.25a
If a department, independent establishment, or agency of the United States which uses water and water services from the District of Columbia water supply system has not installed a suitable meter at each point of Federal connection to the system to control and record the use of water through each such connection (as required under § 34-2401.25(a)) as of the expiration of the 60-day period which begins on December 21, 2001:
Dec. 21, 2001, 115 Stat. 943, Pub. L. 107-96, par. 52(b)(2)
“This section and the amendments made by this section shall apply with respect to fiscal year 2002 and each succeeding fiscal year.”
Pub. L. 107-96, 115 Stat. 944, the District of Columbia Appropriations Act, 2002, provided in part:
This section is referenced in § 34-2401.25.