Conn. Agencies Regs. § 29-232-5
The owner or user shall prepare each boiler for internal inspection and shall prepare for and apply a hydrostatic pressure test when required on the date specified by an inspector, which date shall be not less than seven days after the date of notification.
(Effective August 25, 1987)