- (a) All loose and hanging ACM shall be adequately wetted and removed as required in Section 19a-332a-7.
- (b) Filler material applied to gaps in existing material shall contain no asbestos, adhere well to the substrate and provide an adequate base for the encapsulant.
- (c) Encapsulants shall be applied using only airless spray equipment unless otherwise approved by the Department.
(Effective December 27, 1990)