Conn. Agencies Regs. § 16-11-42
(g) Whenever normal excavation discloses unsatisfactory foundation, one or more of the following corrective measures shall be adopted:
(k) The ditch underneath, around and over the pipe shall be backfilled with good material thoroughly tamped to secure a firm support. To disclose any settlement of the backfill which may need correcting, newly filled ditches shall be reinspected at intervals for sufficient period of time subsequent to completion of backfilling operations.
(l) Service connections may be tapped into cast iron mains if the diameter of the hole does not exceed one-quarter of the diameter of the main, otherwise, and in mains other than cast iron, a saddle, sleeve or welded connection may be used or a tee cut into the line.