Conn. Agencies Regs. § 16-11-22 – Meter location | Midpage
§ 16-11-22
Conn. Agencies Regs. § 16-11-22
Meter location
Department of Public Utility Control
(a) Meters may be located inside or outside of a building depending upon local conditions and all meters shall be accessible for reading.
(b) When located inside a building, the meter shall be installed as near as practicable to the point of entrance of the service, be in a clean, dry, safe place and be supported in such a manner as to be as free as possible from damage that will render it unsafe or inaccurate.
(c) When located outside a building, the meter shall be installed as near as practicable to the building and be supported in such a manner as to be as free as possible from damage that will render it unsafe or inaccurate. The gas company shall install an accessible shut-off cock ahead of the meter.